The lab is moving in its final location

At the end of April and beginning of May 2024, we will move into our new premises and leave the temporary building where we have been since 2019. This is a high-pressure move, as we are going with 3 Orbitraps and a TOF/TOF and adding the new Astral to our equipment.
The address, the phone extensions, and the email remain unchanged. See Where to find us on the ESPCI campus page for more details.

Here are a few pictures of the empty lab... where there are still a few adjustments to be made.

JPEG - 534.2 ko
LC exhaust - Fenn (Nano & microfluidics) room
JPEG - 1.7 Mo
Wel lab - Edman (Wet Lab)
JPEG - 1.8 Mo
Freezer area - Fahrenheit (Freezers) room
JPEG - 1.4 Mo
MS lab - Thompson (Spectros) room
JPEG - 1.4 Mo
MS lab - Thompson (Spectros) room

Haut de page



À lire aussi...

Installation du passeur Nanomate triversa !

Le LTQ-FT ultra est désormais équipé d’un passeur Nanomate Advion qui doit à terme permettre de faciliter nos analyses en infusion directe à haute (...) 

> Lire la suite...

The lab moved in September 2019 in a temporary building

We have moved in a new dedicated building. Our new lab is now installed in Batiment K, just to the left when entering through the main (...) 

> Lire la suite...